摘要
铁路旅客列车、车站灭鼠工作达标合格验收以后,如何巩固灭鼠成果,一直是广大消杀工作者研究的新课题。贵阳铁路分局卫生防疫站通过实施强化科学管理,从工作策略、组织措施、技术措施、人员设备等方面着手,科学合理投药,连续五年经国家、省市、成都铁路局多次检查验收,车站、旅客列车鼠密度一直控制在国家规定标准内,较好地巩固了灭鼠成果。
How to consolidate deratization effort is still a new subject for deratization workers after train and station deratization job has passed the examination. Giu Yang Rail- way Substation Epidemic Prevention Station sets about implementing scientific management by adopting work method.taking organisation control and technical measures. personnel and equipment, sting bait reasonably and scientifically. Through examination by country. province.City government and Chen-Du Rarlway Department for five years runing, the rat density is lower than the level set by the country and the deratization achievements have been consolidated.
出处
《医学动物防制》
2000年第8期403-405,共3页
Journal of Medical Pest Control