摘要
介绍了星村煤矿副井井筒基岩段利用综合机械化作业快速施工的施工方案、施工方法 及采取的技术措施,对整个施工项目进行了技术经济分析.
The paper deals with the plan, the method and the technical measures of the quick construction, by fully-mechanized operation, in bedrock section of the auxiliary shaft of Xingcun Coal Mine, and makes an economic and technical analysis of the project.
出处
《焦作工学院学报》
2004年第6期440-442,共3页
Journal of Jiaozuo Institute of Technology(Natural Science)