期刊文献+

青藏铁路隧道施工电力设备选型及高原适应性技术研究

A Technical Research on Power Equipment Selection and Plateau Adaptability in Tunnel Construction of Qingzhang Railway
下载PDF
导出
摘要 以青藏铁路昆仑山、风火山隧道供电系统为例,介绍了青藏铁路施工电力系统的可靠性研究与柴油发动机功率补偿和设备的高原适应性改造技术。该技术不仅提高了发电机的高原使用效率,而且保证了供电系统安全、可靠,满足了高原冻土隧道施工和生活用电需要。 In this article, the construction power system for Fenghuoshan Tunnel is taken as an example to introduce the researches in the construction of Qingzang Railway and the techniques to improve diesel engine power compensation and the plateau adaptability of power equipment.These techniques not only increase the working efficiency of generators on the plateau,but also guarantee the safety and reliability of the power supply system,satisfying the need of power supply for tunnel construction and residence in the frozen zone on the plateau.
出处 《石家庄铁道学院学报》 2004年第4期9-12,共4页 Journal of Shijiazhuang Railway Institute
基金 铁道部科技攻关项目(2001G001-E-06)
关键词 高原铁路 发电机组 配电系统 冻土隧道 plateau railway generator set power distribution system tunnel in frozen soil
  • 相关文献

参考文献3

二级参考文献1

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部