润扬大桥主缆用127丝PPWS制作工艺的质量控制 被引量:6

Quality Control of Manufacturing Procedures of 127-Wire PPWS for Main Cables of Runyang Bridge
下载PDF
导出
摘要 主缆是悬索桥的主要承重和传力构件,其索股的质量直接影响悬索桥的工程质量。通过对润扬大桥南汊桥127丝预制平行钢丝索股(PPWS)制作和架设工艺特点的分析,提出悬索桥主缆PPWS施工质量控制的方法。 The main cables of a suspension bridge are the major components carrying and transferring loads on the bridge. The quality of the wire strands forming the main cables has a direct influence on the quality of the whole suspension bridge. In this paper, based on the analysis of the manufacturing and erection procedures of the 127-wire prefabricated parallel wire strands (PPWS) for the main cables of the suspension bridge (south bridge) of Runyang Bridge, the methods for construction (both manufacturing and erection) quality control of the main cables of the bridge are provided.
出处 《桥梁建设》 EI CSCD 北大核心 2004年第6期70-72,76,共4页 Bridge Construction
关键词 悬索桥 主缆 制作工艺 架设 质量控制 suspension bridge main cable manufacturing procedure erection quality control
  • 相关文献

参考文献2

二级参考文献2

  • 1.GB/T17101—1997.桥梁缆索用热镀锌钢丝[S].,1997..
  • 2交通部第二公路局科研所.悬索桥设计与施工技术[M].西安:陕西旅游出版社,1994..

共引文献33

同被引文献48

引证文献6

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部