摘要
结合东同矿业公司井下原地溶浸的试验研究情况,分析了细菌浸出-萃取-电积工艺过程中存在的问题并提出了解决方法,探讨了该工艺应用研究的发展方向与前景。
Based on underground in-situ leaching test work in Dongtong Mining Ltd, this article analyzes the problems existing in the process of bacteria leaching-extraction-electrowining and gives their solutions. The development orientation and prospect of application of this process are discussed.
出处
《铜业工程》
CAS
2004年第4期1-3,共3页
Copper Engineering
关键词
黄铜矿
井下原地破碎
细菌浸出
萃取
电积
Chalcopyrite Underground in-situ Crushing Bacteria leaching-extraction-electrowining