期刊文献+

基于CSP的Job shop调度算法研究 被引量:9

A Job shop Scheduling Algorithm Based on Constraint Satisfaction Problem
下载PDF
导出
摘要 针对一类典型的约束满足问题--Job shop调度问题,提出一种CSP调度算法框架,详细讨论CSP 调度算法中的工序开始时间窗、一致性预处理、搜索空间概率模型、工序排序启发、开工时间排序启发的求解 方法。仿真结果表明CSP调度算法在较小的计算时间代价下,获得了FT10标准调度问题的近优解。 For the job shop scheduling problem, scheduling model and scheduling algorithm based on constraint satisfaction problem are proposed. Operation start time window, consistent enforcing, probabilistic model of the search space, operation ordering heuristics and start time ordering heuristics are introduced. The simulation indicates that this new scheduling algorithm yields a approximate result of FT10 benchmark problem under small time cost.
出处 《系统工程》 CSCD 北大核心 2004年第11期15-18,共4页 Systems Engineering
基金 国家863高技术研究发展计划资助项目(2003AA41110)航空基金资助项目(01H53061)
关键词 JOB shop调度 约束满足问题 工序开始时间窗 概率模型 工序排序启发 开工时间排序启发 Job shop Scheduling Constraint Satisfaction Problem Operation Start Time Window Probabilistic Model Operation Ordering Heuristics Start Time Ordering Heuristics
  • 相关文献

参考文献8

  • 1Tsang E. Foundations of constraint satisfaction[M]. London:Academic Press,1995.
  • 2Baptiste P,Pape L. Constraint-based optimization and approximation for job shop scheduling[A]. Proceedings of the AAAI-SIGMAN workshop on intelligent manufacturing systems,IJCAI-95[C]. Canada,1995.
  • 3Minton S. Integrating heuristics for constraint satisfaction problems:a case study[A]. Proceedings of AAAI-93[C]. 1993.
  • 4Dechter R. Network-based heuristics for constraint satisfaction problem[J]. Artificial Intelligence,1987,34.
  • 5Fox M S. Constraint-directed search:a case study of job-shop scheduling[D]. Department of Computer Science,Carnegie-Mellon University, 1983.
  • 6杨宏安,孙树栋,王荪馨,吴秀丽.基于约束满足的Job-Shop调度算法研究[J].计算机工程与应用,2003,39(31):36-37. 被引量:11
  • 7陈恩红,薛瀚宏.基于约束满足的Job-Shop调度问题求解方法研究[J].软件学报,1998,9(12):946-948. 被引量:13
  • 8段黎明,陈进,刘飞.基于约束分析的 Job Shop 调度算法的综述[J].重庆大学学报(自然科学版),1998,21(1):133-138. 被引量:11

二级参考文献7

  • 1Bartak R.Constraint Programming:A Survey of Solving Technology[J]. AIRONews journal ,Italy, 1999;4(4).
  • 2Bartak R.Constraint Programming:What is behind?[C].In:Proceedings of CPDC99 Workshop,Gliwice, 1999-06.
  • 3Bartak R.Constraint-Based Scheduling:An Introduction for Newcomers[R].Technical Report TR 2002/2,Department of Theoretical Computer Science and Mathematical Logic,Charles University,2002.
  • 4Dechter R.Network-based heuristics for constraint satisfaction problem[J].Artificial Intelligence, 1987 ;34.
  • 5Philippe Baptiste,Le Pape.Constraint-Based Optimization and Approximation for Job Shop Scheduling[C].In:Proceedings of the AAAISIGMAN Workshop on Intelligent Manufacturing Systems,IJCAI-95, Montreal, Canada, 1995.
  • 6刘飞,制造系统工程,1995年
  • 7熊锐,吴澄.车间生产调度问题的技术现状与发展趋势[J].清华大学学报(自然科学版),1998,38(10):55-60. 被引量:92

共引文献23

同被引文献77

引证文献9

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部