5O. Nilsson, D. Sjelvgren. Hydro unit Start-up costs and their impact on the Short Term Scheduling Strategies of Swedish Power Producers[ J]. IEEE Transaction on Power Systems, 1997,12( 1 ) : 38 - 44.
6Arce A, Ohishi T, Soares S. Optimal dispatch of generating unit of itaipu hydroelectric plant [ J ]. IEEE Transaction on Power Systems,2002,17(2):154 - 158.
7练继建.黄河李家峡水电站双排机组真机试验研究[R].天津大学水利水电系,2004..
8Nejkovskij A A. Chirkey hydroelectric station: design, construction, operation [J]. Hydrotechnical Construction, 1997, 31(8): 22- 28.
9Matveev E S. Architecture of the Toktogul hydroelectric station on the Naryn River [J]. Hydrotechnical Construction, 1988, (11):21 -24.
10Mironov M A, Grech V I, et al. Advanced engineering in the design and construction of the Chirkey hydroelectric station [ J]. Hydrotechnical Construction, 1983, 17(1) : 1 - 10.