小浪底水库坝基防渗墙裂缝对渗流控制的影响 被引量:10

Effects of Crack of Cutoff Wall at the Xiaolangdi Reservoir Dam Foundation on Seepage Control
下载PDF
导出
摘要 小浪底水库坝址处河床覆盖层最深达70余米,采用混凝土防渗墙控制强透水地基的渗流。按三维渗流计算结果表明:防渗墙出现裂缝的位置越高,防渗墙下游心墙底部的相对水头越大,裂缝靠心墙底部最危险,因此,确保心墙与防渗墙连接处的施工质量至关重要;防渗墙出现裂缝开度小于0.3cm时,对渗流场的影响不大,防渗墙下游心墙底部最大相对水头值仅为2.02%;防渗墙完好,上游天然淤积铺盖没有明显防渗作用,只有当防渗墙出现裂缝或开叉时,淤积铺盖的防渗作用才比较明显。 Overburden on river bed at the dam site of Xiaolangdi Reservoir reaches up to more than 70m.Con-crete cutoff wall was used to control the seepage of strong permeable dam foundation.Result of three di-mensional seepage calculation showed that the higher the crack on the cutoff wall is,the higher the relativewater head at the bottom of the lower core wall is,and crack at the bottom of the core wall is the most dan-gerous.Hence it is of utmost importance to assure fine construction quality in the connection of core wall tocutoff wall.The effect on seepage is small when the opening of cutoff wall crack is less than 0.3cm,themaximum relative water head at the bottom of lower core wall is only 2.02%.The upper natural desiltedblanket has no obvious effect of anti-seepage when the cutoff wall is well constructed.Only when there iscrack on the cutoff wall is the effect of Blanket obvious.
出处 《人民黄河》 CAS 北大核心 1993年第9期28-31,共4页 Yellow River
基金 国家自然科学基金委员会资助
关键词 坝基 截水墙 裂缝 渗流控制 cutoff wall at the dam foundation seepage calculation seepage control calculation of threedimensional seepage the Xiaolangdi Reservoir
  • 相关文献

参考文献2

二级参考文献6

  • 1许国安,水力发电,1990年,3期
  • 2李茂芳,大坝基础灌浆,1986年
  • 3张景秀,基础处理技术,1985年,1期
  • 4潘家铮,工程地质计算和基础处理,1985年
  • 5杜延龄,水利水电技术,1980年,6期
  • 6张作--,水利水电技术,1980年,5期

共引文献9

同被引文献51

引证文献10

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部