摘要
简述了大亚湾核电站调试锅炉燃烧设备及系统设计要点,设备满足并保证了锅炉不同负荷下运行要求。
A brief account is given of the design highlights of the combustion equipment and system for Daya Bay Nuclear Power Station preoperational test boilers. The said equipment and system has met the operation requirements of the boilers under various load conditions.
出处
《热能动力工程》
CAS
CSCD
北大核心
1993年第2期57-62,共6页
Journal of Engineering for Thermal Energy and Power
关键词
锅炉
燃烧器
核电站
boiler, burner, air register, oil jet atomicer,relay, efficiency, charateristies