摘要
本文介绍从美国引进的燃气轮机余热锅炉高压过热器运行4个月发生严重变形的经过。分析其变形原因,提出改进方向。
This paper deals with the occurrence after a 4-month operation period of serious deformation on the high-pressure superheater tubes of a heat recovery boiler imported from the USA for use on a gas turbine. The cause of the deformation has been analysed with countermeasures recommended for its alleviation.
出处
《热能动力工程》
CAS
CSCD
北大核心
1993年第6期308-311,共4页
Journal of Engineering for Thermal Energy and Power
关键词
废热锅炉
过热器
变形
heat recovery boiler, deformation analysis