摘要
介绍了黄河口清 8出汊工程的背景、来水来沙情况、河道及海域演变特征 ,并对河口出汊后的新变化进行了分析。
In this paper,the background of Qing 8 branching project,the coming water and sand conditions and the evolution features of river course and sea area in the Yellow River estuary area are introduced,and the new changes after the new branch has been produced in the estuary area are analysed.
出处
《海岸工程》
2000年第4期12-17,共6页
Coastal Engineering
关键词
黄河口
流路演变
清8出汊
Yellow River estuary
river route development
produce a new branch at Qing-8