我国抽水蓄能电站建设经营现状分析 被引量:17

Analysis on status guo of construction and operation of pumped storage hydropower stations in China
下载PDF
导出
摘要 通过对我国五省(市)8座抽水蓄能电站的实地调查,对实际运行资料进行分析计算,论述我国抽水蓄能电站的建设经营现状、存在的问题及其原因,指出我国兴建抽水蓄能电站应注意的有关问题。 Based on the investigation of eight pumped storage hydropower stations ( PSPS ) in five provinces (municipality) in China and the analysis and calculation of their operation situation, this paper expounds the status guo of construction and operation, existing problems and their causes, and indicates the matters needing attention in the building of PSPS in China.
出处 《电力技术(北京)》 CSCD 北大核心 2004年第12期38-42,共5页
关键词 经营现状 中国 建设 实地调查 抽水蓄能电站 问题 实际 分析计算 运行 资料 pumped storage hydropower station ( PSPS ) fund-raising investment building and operating mode electricity rate
  • 相关文献

参考文献4

  • 1国家计委.建设项目国民经济评价—参数与方法[R].1987.
  • 2丁民.蓄能电站的负荷备用效益[J].水能技术经济,1993,(4):7-7.
  • 3陈育文.抽水蓄能电站调峰填谷节煤效益研究[J].水能技术经济,1992,(2):13-13.
  • 4P Guiehon.Operation of pumped storage power stations[A].国际抽水蓄能会议论文集[C].1991.

共引文献1

同被引文献77

引证文献17

二级引证文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部