摘要
通过对我国五省(市)8座抽水蓄能电站的实地调查,对实际运行资料进行分析计算,论述我国抽水蓄能电站的建设经营现状、存在的问题及其原因,指出我国兴建抽水蓄能电站应注意的有关问题。
Based on the investigation of eight pumped storage hydropower stations ( PSPS ) in five provinces (municipality) in China and the analysis and calculation of their operation situation, this paper expounds the status guo of construction and operation, existing problems and their causes, and indicates the matters needing attention in the building of PSPS in China.
关键词
经营现状
中国
建设
实地调查
抽水蓄能电站
问题
实际
分析计算
运行
资料
pumped storage hydropower station ( PSPS )
fund-raising
investment
building and operating mode
electricity rate