期刊文献+

尚未开采区域综采工作面生产能力预测的计算机模型

A Computer Model for Forecasting Productive Capacity of Fully—mechanized Faces in an Intact Mining Area
下载PDF
导出
摘要 在十多个矿井30个综采工作面生产活动信息调研的基础上,应用模糊控制理论,建立了尚未开采区域综采工作面生产能力预测的计算机模型,并编制了一套计算机程序。文中运用已采集的综采工作面资料,检验了该模型的可靠性,并对设计年产500吨特大型矿井——济宁三号井前十年综采工作面生产能力进行了预测。 Based on the investigation of 30 fully-mechanized faces in more than 10 mines, this paper established a computer model for forecasting productive capacity of fullymechanized faces in an intact mining area with the help of fuzzy controu theory, and compiled aset of computer programs. This paper examined the reliability of the model using the data collected from the fully-mechanized faces and forecasts produetive capacity of fully-mechanized faces in No. 3 mine which will be a fully mechanized mine in Jin Ning, shandong.
作者 王连国
出处 《山东矿业学院学报》 CAS 1993年第4期340-345,共6页 Journal of Shandong University of Science and Technology(Natural Science)
关键词 预测 生产能力 回采工作面 coal face model prodiction productive capacity
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部