摘要
根据强夯和强夯置换法的作用机理 ,结合某污水处理厂建 (构 )筑物的特殊性 ,探讨了在复杂地基采用强夯与强夯置换法相结合的方法 ,对不同或同一建 (构 )筑物基础位于不同地基土 ,采用不同强夯参数 。
According to functional mechanism of strong tamping & strong tamping replacement method, it discusses complex foundation.Combined with particularity of building in a waste water factory, method of combining strong tamping method with strong tamping replacement method is adopted. Different strong tamping parameters should be adopted according to different foundation of buildings so as to get ideal effects.
出处
《山西建筑》
2004年第24期46-47,共2页
Shanxi Architecture
关键词
强夯法
复杂地基
强夯置换法
strong tamping method, complex foundation, strong tamping replacement method