摘要
结合多年来现场的施工经验 ,就框架结构施工中基础施工顺序的确定、主体施工主工序等进行探讨 ,提出了框架梁柱节点模板支设的新方法 ,以及装饰工程中应注意的问题 。
Combined with on-the-scene constructive experience of many years, it discusses fixation of basic constructive orders in frame structure construction and main working procedure body construction and propounds new method of sustenance by frame bean, pile, node, point and shuttering with noteworthy problems in adornment project so as to ensure smooth construction of frame structure.
出处
《山西建筑》
2004年第24期76-77,共2页
Shanxi Architecture
关键词
框架结构
施工
工序
frame structure, construction, working procedure