摘要
介绍了陆续新建或投产大批的发电机组 ,主要以循环流化床锅炉为主 ,由于这些新建机组投产试运行过程中前期准备不足或设备自身缺陷 ,导致机组不能正常运行 ,针对这些问题进行分析研究 。
It introduces large batch of new-built dynamo system,mainly circulatory conveyor boiler. Because of not enough preparation in early stage or defects of equipment, dynamo system does not work normally. It analyzes and researches there problems so as to offer a reference.
出处
《山西建筑》
2004年第24期115-116,共2页
Shanxi Architecture
关键词
循环流化床锅炉
燃料
返料
circulatory conveyor boiler, burning, returned fuel