摘要
通过重庆合川双龙湖大桥施工实际,对肋拱桥施工各个阶段的变形及过程控制的重点、难点及方法进行分析、介绍。
By the practice in construction of Chongqing Hechuan Shuanglong Bridge, this thesis introduces and analyses important and difficult point of deformation and process control at each stage of construction of stiffer arch bridge.
出处
《重庆建筑》
2004年第6期28-31,共4页
Chongqing Architecture
关键词
肋拱桥
施工变形
施工控制
桥梁施工
拱架布置
arch bridge
stiffer arch bridge
construction
deformation
process contro