摘要
阐述了工程量清单的定义及编制内容,根据工程量清单编制的原则,介绍了工程量清单计价编制的过程,最后阐明了工程量清单计价的意义以及实施工程量清单后对造价人员和管理部门的要求。
This paper expounds the definition and the contents of the bill of quantities, introduces the preparing procedures of the bill of quantities based on its preparing principles, and describes the significance of the valuation with the bill of quantities and the requirements for the personnel and departments for calculating the construction cost after the carrying out of the bill of quantities.