摘要 针对真空破坏阀、拍门和快速闸门等3种断流装置在生产运用中的情况,分析存在的主要问题,提出了安全、可靠的改进途径,设计发明了新型活页闸门,该闸门在下落过程中允许门扇开启使部分水流通过,这一措施大大减小了水流对闸门的推力,使闸门两侧的摩擦力下降,最终使落门力大大增加而达到快速关闭断流的目的,再利用泵站检修闸门完成止水功能. The main operating problem of three kinds of cut-off device, such as vacuum breaker, flap valve and rapid-drop gate, is discussed. A new kind of safe and reliable cut-off flow way is put forward. The renovating device of loose-leaf rapid-drop gate is invented. The gate can let part of backwards flow passing the outlet passage during its dropping. Through this way, the hydraulic thrust at the gate is largely cut. So the resistance of dropping is also largely cut. Then the intention of increasing dropping velocity is reached. To cut-off backwards flow completely, the examining repair gate at outlet sump should be dropped at last.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2004年第6期36-39,共4页 Engineering Journal of Wuhan University
关键词 泵站 断流措施 活页 快速闸门 pumping station cut-off flow loose-leaf rapid-drop gate
  • 相关文献

参考文献5

二级参考文献25

  • 1李继珊.大型轴流泵站超驼峰水位运行的技术改造.全国泵站工程学术研讨会[M].-,1992..
  • 2李江云.大型低扬程轴流泵装置启动过渡过程计算[学位论文].北京:华北水利水电学院,1992..
  • 3[美]EB怀利 VL斯特里特.瞬变流[M].北京:水利电力出版社,1983..
  • 4怀利EB 斯特里特VL.舜变流[M].北京:水利电力出版社,1983.2.
  • 5索科洛夫E 津格尔HM.喷射器[M].北京:科学出版社,1977.3.
  • 6李江云,中国农村水利水电,1998年,7期
  • 7李继珊,全国泵站工程学术研讨会,1992年
  • 8湖北省水利勘测设计院,大型电力排灌站,1984年
  • 9李江云,中国农村水利水电,1999年,3期
  • 10李江云,中国农村水利水电,1998年,7期

共引文献17

同被引文献6

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部