摘要
连云港庙岭三期集装箱码头是目前国内首次采用先张法大预应力下横梁结构的工程,文章重点介绍了预应力台座施工及构件制作的施工技术。
Phase Ⅲ of Miaoling Container Terminal in Lianyungang Port was the first project in China on which pre-tensioned concrete girders made under high pre-stress were used.The paper describes the construction of the prestressing platform and the technology for construction of concrete elements.
出处
《中国港湾建设》
北大核心
2004年第6期28-30,共3页
China Harbour Engineering
关键词
先张法
下横梁
施工
pre-tensioning technique
lower beam
construction