紧邻被保护建筑的高层楼房定向爆破拆除 被引量:2

DEMOLITION OF A HIGHRISE CLOSE TO A BUILDING TO BE PROTECTED BY DIRECTIONAL BLASTING
下载PDF
导出
摘要 待拆除高层楼房与被保护建筑相距仅 2 0cm ,必须严格控制高楼倒塌过程中的后坐。为此 ,通过人工预处理将待爆破的高楼分成两个独立的楼体 ,并采用控制爆破使两楼体先后倒塌 ;同时 ,采取了一些技术措施 ,避免了爆破过程中高楼的后坐。这些措施包括切口范围内剪力墙的预处理、后倒塌楼体的后支点前移及其爆破切口位置的提高、选用合理的起爆时差等。此外 。 Because the distance between a highrise to be demolished by directional blasting and a building to be protected is only 20 centimeters,the recoil of the highrise on its collapsing must be put under control. For this reason,the highrise is divided into two separated buildings by means of manual pretreatment,and the collapsing of two buildings is made successively with controlled blasting.At the same time,some technological measures are taken,thus avoiding the recoil of the highrise in blasting procedure. These measures include the pretreatment of shear walls in blasting cut,the forward moving of rear support-point and the rise of cut location for the building to be later blasted,the selection of reasonable delayed time and so on. In addition,the safety precautions in blasting demolition of highrises are discussed.
出处 《工程爆破》 2004年第4期40-43,60,共5页 Engineering Blasting
关键词 高层楼房 定向爆破 后坐 爆破安全 Highrise Directional blasting Recoil Blasting safety
  • 相关文献

参考文献4

二级参考文献7

共引文献57

同被引文献13

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部