冶勒水电站大坝沥青混凝土心墙质量控制与管理 被引量:5

Quality control and management of asphalt concrete core wall in the dam for the Yele Hydropower Station
下载PDF
导出
摘要 冶勒水电站地处高寒多雨的四川西南部山区,恶劣的气候条件、紧迫的施工工期,给沥青混凝土心墙施工增加了很大的困难。经过科学论证,精心组织,严格管理,总结出一整套管理、检测及质量控制措施,实现了多项技术突破,确保了沥青混凝土心墙工程的质量和施工顺利进行。 Yele Hydropower Station is located in the southwest of Sichuan Province, where it is cold and rainy. Abominable weather and short construction period of the project bring large difficulties to the construction of the asphalt concrete core. Since some measures such as scientific demonstration, abortive organizing and strict management have been adopted to sum up a suit of measures about management, examine and quality control, some items of technically breakthrough has been realized, the quality of the asphalt concrete core has been ensured and the construction has been process successfully.
机构地区 西安理工大学
出处 《水力发电》 北大核心 2004年第11期32-34,共3页 Water Power
关键词 沥青混凝土心墙 施工参数 检测 质量控制 质量管理 冶勒水电站 <Keyword>asphalt concrete core wall construction parameter examine quality control quality management Yele Hydropower Station
  • 相关文献

同被引文献32

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部