摘要
Seven schemes for the developing extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1. Pingdingshan Mining Bureau.On the basis of conventional technical analysis, an optimum economy-mathmetical model of the developing preparatory schemes is worked out and a synthetic optimum is carried out.
Seven schemes for the devoloping extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1, Pingdingshan Mining Bureau. On the basis of conventional technical analysis, an optimum eeonomy-mathmetieal model of the developing preparatory schemes is worked out and a synthetic optimum is carried out.