动荷下高速铁路桥基础的托换施工 被引量:2

The Foundation Underpinning Construction of High Speed Railway Bridge under Moving Load
下载PDF
导出
摘要 以广深电气化高速铁路基础在不影响运营的情况下进行托换施工为例,介绍高速铁路桥梁动荷载作用下的基础托换施工技术.该工程上部结构为预应力连续梁,且在列车动载作用下不间断运营施工,通过采用双控监测,利用托换梁结合托换新桩的方法,该工程在托换梁与挖孔桩之间设置千斤顶加载,利用千斤顶使上部结构有微量位移,同时使新桩的大部分沉降通过千斤顶的预压来完成.利用千斤顶对位移及受力情况及时进行调整.通过对托换桩进行了加载预压,减小了施工后新桩的沉降,成功解决了施工中的技术难题. Taking the foundation underpinning construction of GuangShen high speed electrified railway bridge for example,this paper introduces the foundation underpinning construction technology.It was so touchy to cope with this problem because the construction was taken out without breaking off the scheduled runs and the superstructure was the pre-stressed concrete continuous beams.Displace and structure were adjusted timely by means of jack once the dual-monitoring information reached.In the same time for the goal of reducing the settle of new states,the states were overload pre-consolidation.
出处 《沈阳建筑大学学报(自然科学版)》 CAS 2004年第4期269-272,共4页 Journal of Shenyang Jianzhu University:Natural Science
基金 广东省建设厅重点攻关项目
关键词 高速铁路桥 连续梁 移动荷载 托换施工 foundation underpinning jacking-up monitor
  • 相关文献

参考文献2

  • 1Wu guoxi, and Lian W D. Dynamic nonlinear analysis pile foundations using finite element method in the time domain[J]. Canada Geotech Journal, 1997(34) :44 - 52.
  • 2David Z, Yankelevsky. Orit Leibowitz. Punching Shear in Concrete Slabs [ J ]. International Journal of Mechanical Sciences, 1999(41 ) :1 - 15.

同被引文献16

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部