摘要
本文介绍了某工程采用振动沉管工艺进行CFG桩与碎石桩联合处理软弱、液化地基的成功经验。该施工工艺,工期短,造价低,处理效果好。
The paper introduces the succeed experience of soft and liquefaction foundation treated by CFG pile and crushed stone pile by means of vibration pile sinking technology. The construction period is short,the cost is save,the treatment effect is good for this construction technology.
出处
《东北水利水电》
2004年第12期23-24,共2页
Water Resources & Hydropower of Northeast China
关键词
软弱液化地基
CFG桩
碎石桩
soft and liquefaction foundation
CFG pile
crushed stone pile