摘要
大同第二发电厂正在兴建 2台国产 6 0 0MW直接空冷机组。根据国产空冷汽轮机及末级叶片的特点 ,以及凝结水精处理设备情况 ,确定合理的满发参数 ,并对空冷电厂的安全运行提出建议。同时提出汽机设计参数确定的方法 。
domestic-made 600 MW direct-cooling-air units are under construction in Datong No.2 Power Plant. The reasonable full load parameters of the units have been determined according to the characters of the domestic-made cooling-air turbine, its last-stage blade and fine treatment device of condensate. The comments are given for the safe operation of the cooling-air power plant. The way to decide the design parameters of the turbine is also given to the investors and technicians of cooling-air engineering for reference also.
出处
《电力建设》
北大核心
2004年第11期7-10,19,共5页
Electric Power Construction
关键词
直接空冷汽轮机
设计思路
参数
安全运行
direct-cooling-air turbine
thinking train of design
parameter
safe operation