摘要
本文分析了黄河青庄险工自1956年修建以来的险情资料、河势变化和维修情况,从中找出该段河势变化的原因,提出了较完善的改建、稳定河势措施。
By analysing the dangerous materials the, riverbed change and the maintenance conditions on the Qing-zhuang section work of the Yellow River since it was built in 1956, this paper finds out the causes of the riverbed change of the Section, puts forward the better reconstructive and steady flow measures.
出处
《黄河水利职业技术学院学报》
2000年第2期14-15,共2页
Journal of Yellow River Conservancy Technical Institute
关键词
黄河青庄段
河势变化
原因分析
稳定措施
Qing-zhuang section of the Yellow River
riverbed change
cause analysis
steady folw measure.