摘要 针对大坪车站隧道工程跨度大、埋深浅、地面人口及建筑密集等情况,经过方案比较选择,参考施工过程中力学行为模拟分析结果,在地铁工程施工中提出了“在大管棚预支护下,上半断面侧壁导坑法,下半断面先中槽后侧墙开挖、先拱后墙衬砌”的隧道施工新方法,成功建成了特大跨、超浅埋城市车站隧道。 Chongqing Daping light railway station is located in downtown of Chongqing, where there is a dense population as well as numerous buildings. Daping station tunnel has a clear span of 19.8 m, whereas its excavation span and area are 26.3 m and 430.3 m2, respectively, only 4 m overburden and with a surrounding rock of category III. In view of complex and unfavorable surface conditions over the station tunnel, such as house buildings and city roads, both of which can't resist severe shocks or vibrations, it is necessary that small vibrations induced in tunnel construction process and a strict requirement for the surface subsidence amount be favourable. According to the characteristics of large span and ultra-shallow-buried, located in a densely populated city area of numerous buildings, a new method is proposed to use advanced support of large pipe-roof protection and the tunnel section is divided into two parts during the process of construction. The upper part is operated by using two-side pilot drifting method, while the lower part is excavated from the middle to walls, and the arch lining is constructed before the tunnel wall-lining. The method is developed from numerical simulation of the deformation of rocks during the tunnel construction. The application of this method proves to be successful in the construction of Daping light-railway station tunnel.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2005年第2期290-295,共6页 Chinese Journal of Rock Mechanics and Engineering
关键词 隧道工程 轻轨 开挖方法 衬砌 Construction Deformation Linings Numerical methods Subsidence Tunneling (excavation)
  • 相关文献

参考文献9

二级参考文献41

  • 1盛谦,丁秀丽,冯夏庭,冯夏庭,张治强.三峡船闸高边坡考虑开挖卸荷效应的位移反分析[J].岩石力学与工程学报,2000,19(z1):987-993. 被引量:39
  • 2朱维申 何满潮.复杂条件下围岩稳定性与岩体动态施工力学[M].北京:科学出版社,1996..
  • 3傅冰清 徐平 等.岩体边坡监控理论的研究[M].武汉:长江科学院,2000..
  • 4陈德基 薛果夫 等.永久船闸三闸室中隔墩地质条件及其对岩体变形和裂隙的影响分析[M].武汉:长江水利委员会勘测局,1999..
  • 5.GB50229-99.地下铁道工程施工及验收规范[S].,..
  • 6孙钧.对《复杂条件下围岩稳定性与岩体动态施工力学》的书评[J].岩石力学工程学报,1996,15(4):407-407.
  • 7李焯芬.对《复杂条件下围岩稳定性与岩体动态施工力学》一书书评(译文)[J].岩土力学,1997,18(2):47-47.
  • 8刘天泉.简评《复杂条件下围岩稳定性与岩体动态施工力学》一书[J].煤炭学报,1998,23(2):454-454.
  • 9王梦恕.对《复杂条件下围岩稳定性与岩体动态施工力学》一书的评语[J].西部探矿工程,1999,11(2):15-15.
  • 10彭一江 王兴珍 孙东亚.基于非连续变形模型的高岩坡稳定分析[J].岩石力学与工程学报,2001,20(2):1551-1554.

共引文献245

同被引文献261

引证文献38

二级引证文献387

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部