期刊文献+

润扬大桥结构健康监测系统传感器测点布置 被引量:20

SENSOR PLACEMENT FOR THE HEALTH MONITORING SYSTEM OF RUNYANG BRIDGE
下载PDF
导出
摘要 润扬长江公路大桥作为我国建桥史上规模空前的特大型桥梁 ,对其建设和运营期间的健康监测、诊断以及各种灾害影响下的损伤预测和损伤评估 ,具有重要的现实意义 ,这也是润扬大桥设置结构安全健康监测系统的主要目的。作为该系统所要解决的最关键问题之一 ,就是合理解决传感器测点的最优布置。基于这一考虑 ,详细介绍了以有限元模型分析结果和基于广义遗传算法的主梁传感器测点优化布置为主要理论依据 ,最终形成的润扬大桥结构安全健康监测系统的传感器测点布置。 Runyang Yangtse River Highway Bridge is the longest bridge at present,it is prac tically significant to health monitoring, diagnosis, forecast and evaluation of injury influenced by disasters, during its building and working, also, it is the purpose of the Health Monitoring System of Runyang Bridge. As one of the most i mportant problems of the system, optimum placement of sensor must be sloved rati onally. From this point of view, in detail this paper introduces the primary aca demic gist, which contains analytic result of finite element model and optimum p lacement of sensor in girder based on generalized genetic algorithm, and sensor placement for the Health Monitoring System of Runyang Bridge.
出处 《工业建筑》 CSCD 北大核心 2005年第1期82-85,共4页 Industrial Construction
基金 国家自然科学基金资助项目 (编号 :5 0 3 780 17)
关键词 润扬大桥 健康监测系统 桥结构 测点布置 运营期 润扬长江公路大桥 桥梁 结构安全 损伤评估 安全健康 health monitoring sensor optimum placement f inite element model generalized genetic algorithm
  • 相关文献

参考文献3

  • 1Kiviluoma R. Coupled-Mode Buffeting and Flutter Analysis of Bridges. Computers and Structures, 1998,70:219-228.
  • 2Delaunay D, Grillard G. Field Measurements of the Wind-Induced Response of a Cable Stayed Bridge: Validation of Provisional Studies.Journal of Wind Engineering and Industrial Aerodynamics, 1998,74 - 76:883 - 890.
  • 3Manabu Ito. Cable-Supproted Steel Bridges: Design Problems and Solution.J.Construct Steel Res,1996,37(1) :69 - 84.

同被引文献204

引证文献20

二级引证文献123

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部