摘要
随着500 kV电网的建设,500 kV变电所越来越多,电网的运行方式迫切需要认真分析,电网设备的安全性、运行的可靠性也需要仔细研究,以无锡新投产的500 kV锡东南变电所为例,对其接入电网后各种运行方式进行分析探讨,提出了调度部门安排电网运行方式的一些方法与实施步骤。
With the construction of 500 kV electric power network,there are more and more 500 kV electric power substations. The running modes of electric power network require urgent and careful analysis. The security of the electric power equipment and the running reliability need further. This paper takes example of 500 kV Xidongnan electric power substation,which was plunged into running recently in Wuxi,and analyzes and discusses all kinds of the running modes after it was connected to electric power network,and puts forward some means and implementary steps of the running modes of electric power network which are arranged by the dispatch department.
出处
《江苏电机工程》
2005年第1期31-33,共3页
Jiangsu Electrical Engineering
关键词
运行方式
安全性
可靠性
分析
the running mode
security
reliability
analysis