摘要
对新建铁路初期采用新建单线、新建单线预留复线远期增二线 ,以及新建双线铁路的不同建设模式 ,从工程数量、工程投资。
This article performs a comparison and analysis of the different construction modes such as constructing a single track line at the beginning of a newbuild railway, newbuilding a single track line with reservation for double tracking in the distant future, and newly constructing a double track line, in the aspects of bill of quantities, engineering investment and land take of the railway.
出处
《铁路工程造价管理》
2005年第1期3-8,共6页
Railway Engineering Cost Management
关键词
单线双线铁路
建设方式
分析
single and double line railway, construction mode, analysis