摘要
以新乡火电厂100m高钢筋混凝土烟囱的爆破拆除工程为例,介绍了钢筋混凝土高烟囱定向拆除工程中的方案选择的基本原理、设计方法。成功地拆除了复杂环境下100m高的烟囱,且未对周围建筑物造成任何危害,达到了良好的爆破效果。
Taking the blasting demolishing project of 100-meter high reinforced concrete chimney in Xinxiang thermal power plant for example, the basic principle of plan selecting and design method in directional demolishing project of high reinforced concrete chimney are introduced. The 100-metre high chimney is successfully demolished in the complex circumstances, which does not bring about any damage to the buildings around. Good blasting effect is obtained.
出处
《西部探矿工程》
CAS
2005年第2期114-116,共3页
West-China Exploration Engineering
关键词
高烟囱
控制爆破
拆除
high chimney
controlled blasting
demolishing