摘要
本文介绍了大陆首次采用的线上移动式接触焊施工技术,结合广州地铁二号线施工监理的实践,对两种焊轨方案进行了技术比较和经济分析,提出其应用价值和完善该技术的建议。
The technique of linearly movable contact-weld is introduced which is first used in the mainland. Both project of weld are technically compared and economically analyzed according to the watching practice in Guangzhou Metro Line 2. Finally the available value is presented and the suggestion of updating is given.
出处
《铁道工程学报》
EI
2004年第4期17-20,共4页
Journal of Railway Engineering Society