摘要
针对忠-武输气管道工程投资高、建设周期长和项目组织难度大等特点,采用P3控制技术,完成了忠-武输气管道工程信息管理系统。该管理系统具有工程基本信息管理、综合进度管理、合同与费用管理等功能,在整个工程施工过程中为业主、监理工程师对合同、工程进度和费用等方面的管理提供了科学、快捷的手段。
Zhongxian-to-Wuhan gas pipeline transmissionprojecthas some problems such as high cost,long construction period and difficult management. P3 control technique is used to establish the information management system for the Zhongwu-Wuhan gas pipeline transmission project. This system has a variety of functions,such as project basic information management,integral process management,contract and cost management,and can provide scientific and effective methods to owner and consultation engineers in the whole process of project.
出处
《石油规划设计》
2004年第6期29-30,共2页
Petroleum Planning & Engineering