摘要
考虑拱坝分期施工过程,采用常刚度加速迭代算法研究了横缝间隙对小湾拱坝应力状态的影响.对灌浆后横缝没有间隙和存在0 5mm的间隙两种情况进行的对比计算和分析结果表明,横缝间隙的存在对坝体应力分布规律的影响不大,但对应力的大小有较大影响,即坝体上游面拉应力大小和拱冠梁底部拉应力范围均有明显增大.
In consideration of different construction phases of an arch dam, the influences of gaps of transverse joints on the stress of the Xiaowan arch dam were studied by use of the accelerated iteration method with a constant stiffness. A comparative calculation and analysis of the Xiaowan arch dam for two cases-0.5?mm gap of transverse joints and absence of gaps-shows that the gap has little influence on the stress distribution, but has obvious influence on the value of stress, and that the extreme value of tensile stress on the upstream surface and the tensile stress area on the bottom of cantilevers increase notably.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
北大核心
2005年第1期76-80,共5页
Journal of Hohai University(Natural Sciences)
基金
国家自然科学基金资助项目(90410011
50409017)
关键词
横缝
初始间隙
常刚度迭代
拱坝
transverse joint
initial gap
constant stiffness iteration
arch dam