南水北调渠道工程移民安置关键问题与对策 被引量:3

Key problems on resettlement induced by channel construction in South-to-North Water Transfer Project and countermeasures
下载PDF
导出
摘要 通过对南水北调渠道工程特征和征地特点的分析,提出渠道工程移民的特征,指出南水北调渠道工程移民安置将面临人口界定、城乡接合部移民安置和临时占地三大关键问题,并根据已建河道工程移民安置的经验和教训,提出了相应的对策. Based on an analysis of the characteristics of the channel project and nature of land acquisition in the South-to-North Water Transfer Project, three key issues, concerning resettlement induced by channel construction in the South-to-North Water Transfer Project were presented, including the definition of resettlers, the arrangement of resettlers from urban and rural jointing areas, and the temporal land occupation. Some countermeasures were put forward through learning of experiences and lessons from some projects having been constructed.
出处 《水利水电科技进展》 CSCD 北大核心 2005年第1期64-66,共3页 Advances in Science and Technology of Water Resources
关键词 南水北调工程 渠道工程 移民安置 South-to-North Water Transfer Project channel project resettlement
  • 相关文献

参考文献1

共引文献1

同被引文献9

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部