摘要
云龙水库溢洪道布置于天然垭口,受地形条件限制,堰后泄槽陡坡段急剧跌落 28 3m,紧接转角为 42 67°的转弯段,水力条件很差,必须在陡坡泄槽段进行消能. 本工程陡坡泄槽段设置 5级阶梯消力池消能,通过水工模型试验验证,消能效果较好,能使水流平稳通过转弯段.
The spillway of Yunlong Reservoir is located at a natural saddle of one of the river banks.Because of limited topographical conditions,there is a 28. 3m sudden chute drop behind the saddle and after that the chute immediately turns abruptly at a angle of 42. 67°.For these poor hydraulic conditions the energy dissipation here has to be carried out in the steep chute itself.Five stepped energy dissipaters are disposed along this steep chute.The data obtained have already shown very satisfactory results and stable flow movement for this steep bend chute.
出处
《水利水电技术》
CSCD
北大核心
2004年第12期40-41,49,共3页
Water Resources and Hydropower Engineering
关键词
溢洪道
跌坎
阶梯消力池
T型消力墩
spillway
drop sill
stepped energy dissipater
T-shaped dissipater