太平驿水电站在引水隧洞开挖中采取了优化管道通风、加强机械净化,实施水幕降尘、加强个人防护等综合治理措施,收到了较好的成效。
Comprehensive measures in headrace tunnel excavation of Taipingyi hydropower station, such as optimized control of ventilation, intensive mechanism purification, water screen dedustering, persormal protection have showed good rasults.
出处
《水力发电》
北大核心
1993年第9期17-20,共4页
Water Power
关键词
引水隧洞
开挖
水电站
通风治理
Taipingyi hydropower station, headrace tunnel, ventilation, treatment