摘要
隔河岩水利枢纽自然条件比较复杂,枢纽任务以发电为主。在设计中充分而科学地利用水文、地质资料,注意流域梯级开发的整体效益,进行枢纽总体布置,全面优化设计,应用国内外先进技术,采用重力斜拱坝、宽尾墩加射流消能、科学的厂房布置、300t级提升高达122m的升船机等都具有相当的水平。
In view of complex nature condition, the main purpose of Geheyan project is electricity generation. with constantly improving of design works, the following efforts have been input: adapting hydrologic and geologic data; focussing on the whole benefits of the valley development; optimizing design works and general layout: inputing advanced technology, such as inctined gravity-arch dam, wide tall-pier with jetting energy dissipation, 300t capacity and 122m raising shiplist, ect..
出处
《水力发电》
北大核心
1993年第10期32-34,共3页
Water Power
关键词
水利枢纽
设计
隔河岩
Geheyan project, introduction, general layout, optimization design