摘要
介绍了我国自行研制的700t/d水泥生产线在泰国萨拉布里水泥厂的调试及投产过程,并对调试过程中出现的问题进行了分析和研究,同时采取了相应的解决办法。目前,在泰国该项目的生产技术性能考核已一次性达标通过。
The author gives an introduction to the whole course of commissioning and trial production for a 700 t/d Sara Buri Cement Plant in Thailand. He also studies and analyses the problems which occured during commissioning,and gives the way how to treat them. At present,the performance test for this project has been passed with all technical data obtained to meet the expected targets.
出处
《水泥》
CAS
1993年第8期1-6,共6页
Cement