摘要
简要介绍连云港从1931年至今的建港过程和发展情况,阐述连云港淤泥质海岸的自然特征和所进行的大量回淤研究工作,及在淤泥质海岸建港的对策。
Construction process and development situation of Lianyungang Port since1931 are briefly introduced; The natural characteristics of the silty coastat Lianyungang, large quantities of research work for siltation, as well asways of constructing a port at silty coast are set forth.
出处
《水运工程》
北大核心
1993年第5期1-4,共4页
Port & Waterway Engineering