摘要
镇江港大港二期工程道路和堆场采用混凝土机制联锁块铺砌面层。本文对混凝土机制联锁块的施工技术要点、施工方法及验收标准作了简要叙述。
Concrete interlocking blocks are adopted in paving road and storage yardin the 2nd-phase project of Dagang of Zhenjiang Port.Essentials of constructiontechnique, construction method and examination standard of concrete interlock-ing blocks are briefly introduced.
出处
《水运工程》
北大核心
1993年第9期54-55,53,共3页
Port & Waterway Engineering