摘要
主要从工程概况、强夯试验、强夯加团等方面介绍强夯法加固地基在南通狼山港二期工程的实地应用及试验情况。
On-the-spot application of heavy tamping method for consolidation offoundation in the 2nd-phase project of Langshan Port of Nantong and its testare introduced in respects of general situation of project, heavy tamping testand heavy tamping for consolidation, etc.
出处
《水运工程》
北大核心
1993年第11期47-51,共5页
Port & Waterway Engineering