摘要
概述了大窑湾一期工程前四个泊位港区回填后采用强夯法。
Consolidation treatment of port areas of the first four berths of Dayaowanlst-phase Project by heavy tamping method, heayy tamping crushed stonepost & crushed stone shell method, as well as heavy tamping stone framewith shell method after refilling is briefly introduced.
出处
《水运工程》
北大核心
1993年第12期51-57,共7页
Port & Waterway Engineering