摘要
大窑湾一期工程通信导航系统由有线通信和无线通信两部份组成,全部设备利用世界银行贷款,按国际招标和直接询价两种方式配置设备,本文对此作了简要介绍,并对工程管理提出了看法。
The communications and navigation aid system of Dayao wan ls:-phase project,which consists of wire communications and radio communications, all theequipments of which are purchased by getting loan from the World Bank,andthrough international bidding and direct price inquiring.Brief introduction ismade to the above-mentioned system and some views are given to its management.
出处
《水运工程》
北大核心
1993年第12期38-40,共3页
Port & Waterway Engineering