摘要 隧道支护结构应力分析习惯于采用平面应变问题来处理。当隧道采用新奥法施工时,按平面应变问题来处理则是不完善或不正确的。因为采用新奥法施工的隧道,其喷锚支护是随着隧道开挖紧跟着掌子面完成的,其应力状态相当复杂而且基本上属于三维问题,非采用一般平面分析方法所能解决。本文目的在于建立一个模拟隧道掘进与支护过程的三维计算模型,用以解决新奥法施工隧道的应力分析。 In the tunnel support construction stress analysis, it is conventional to use two dimen-sional strain principle. However this mathod is imperfect when tunnel is constructed by theNATM. An important reason is rock-bolting. and shotcrete lining are applied closely follow-ing the working face which is excavated, the stress state is three dimensions and is very com-plicated during the stress analysis is not solved by planar strain principle. The aim of this pa-per is to set up a three dimensional calculate model which is used to model an excavating andsupporting process of the tunnel and to solve the stress analysis of the tunnel constructed byNATM.
机构地区 兰州铁道学院
出处 《铁道学报》 EI CAS CSCD 北大核心 1989年第3期86-92,共7页 Journal of the China Railway Society
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部