摘要
在矿山生产中,采掘机械的数量多少与性能好坏直接影响到矿山的生产规模与生产效率的提高。如何以尽可能少的设备,通过优化配置来实现矿山的设计生产能力,这无论是对已开采的矿山还是对新建矿山,都是一个值得深入研究的问题。本文着重研究地下采掘机械优化配置的方法问题,并以一实例给出了分析的方法和步骤。
In mining production,the quantity and property of mining machinery affect directly the production scale and efficiency. It is importance to a digging mine or a newly-built mine how to use mining machinery as less as possible to realize the design capacity of a mine by optimal fitting. This paper mainly studies the method of optimal fitting of underground mining machinery,and analyses an actual example by integral programming.
关键词
地下
采掘机械
最佳化
配置
underground mine, mining machinery, optimal fitting, integral progrmming, stratagem