3BANERJEE A.A.Joint Economic-lot-size Model for Purchaser and Vendor[J].Decision Science,1986,17(3):292-311.
4BEN-DAYYA M,RAOUF A.Inventory Models Involving Lead Time as Decision Variable[J].Journal of Operational Research Society,1994,45(5):579-582.
5GHODSYPOUR S H,O'BRIEN C.The Total Cost of Logistics in Supplier Selection,Under Conditions of Multiple Sourcing,Multiple Criteria and Capacity Constraint[J].Int.J.Production Economic,2001,73(1):15-17.