摘要
本文对已建关河水库引水发电洞结构进行了复核计算。在计算结果的基础上,对引水发电洞出现的问题进行分析。分析认为,关河水库引水发电洞的承载能力满足要求,但限裂不满足。
This paper has checked the calculation to the tunnel structure for water supply for generating of Guanhe Reservoir.It has analyzed the existing problems,based on the calculation result.The conclusion is the load-carrying capacity is satisfaction of requirements,but the crack limited is not.