本文对在石油炼制过程中燃气轮机电站与加热炉的联合运行作了初步探讨。对其经济性、可行性和联合装置中可能出现的一些问题进行了讨论。
This paper is devoted to a preliminary study of the combined operation of agas turbine power station and heating furnaces during the process of petro-lium refining.Also discussed in this paper are certain aspects concerning itseconomy,feasibility and some possible problems which may arise in connec-tion with the operation of the combined unit.